Processes
What will AGI do for Design and Construct productive assets?
With no child occupations seeded, this scalar is derived from the PCF top-level category lens. The prompt's calibration anchor for 'Acquire, Construct, and Manage Assets' is approximately 0.20, reflecting that while the 'design' phase involves knowledge work, the ultimate 'construction' of productive utility infrastructure (power lines, substations) is inherently physical, labor-intensive work.
A capital investment plan is approved for new generation, transmission, or distribution infrastructure.