Processes
What will AGI do for Obtain resources?
With no child occupations seeded, the scalar relies entirely on the APQC lens and process description. The top-level category 'Design and construct productive assets' carries a strong physical prior (around 0.20). The specific process of gathering construction resources and verifying training represents the on-site orchestration, procurement, and dispatch layer of physical work, keeping it firmly in the physical band.
A project plan or construction phase initiates the requirement for specific labor, materials, and equipment.