Processes
What will AGI do for Request engineering change?
With no seeded child occupations to roll up, I relied entirely on the process description and lens prior. The description explicitly defines this process as issuing a 'formal notice' (an engineering change order) to rectify problems in physical production lines. Although the context is physical manufacturing, the value-producing step itself is an information and documentation task (drafting and routing a request), so I selected the digital band-center value (0.85).
A defect is identified during a production run or a requirement emerges for a new or revised product design.