Processes
What will AGI do for Test meters?
With no child occupations seeded, the scalar is derived from the process name ('Test meters') and its industry context ('Electric Power Generation, Transmission and Distribution'). Testing utility meters inherently requires hands-on, on-site interaction with physical electrical infrastructure to attach diagnostic equipment and verify hardware integrity. Because the core value step relies on physical equipment manipulation rather than remote information processing, this process is anchored at a band-center physical value.
A scheduled maintenance interval is reached, anomalous usage is detected, or a customer requests a meter accuracy verification.