What will AGI do for Bulk liquid storage tanks construction and maintenance?

Construction and maintenance of bulk liquid storage tanks. According to the tank construction code, tanks must be inspected periodically for corrosion and other damage. Inspection and maintenance of steel aboveground storage tanks used in the petroleum and chemical industries, as well as cleaning, repairing, altering, and reconstructing them.

The work itself

Grounded Work Profile

Tools

  • Structural CAD SoftwareserviceBlueprint
  • Permit Management SystemserviceBlueprint
  • Nondestructive Testing SystemserviceBlueprint
  • Asset Inspection SystemserviceBlueprint

Outputs

  • Tank Design DrawingsserviceBlueprint
  • Integrity Inspection ReportserviceBlueprint
  • Weld Test RecordsserviceBlueprint

Measured by

  • Inspection Compliance RateserviceBlueprint
  • Leak Incident RateserviceBlueprint

Key steps

  • Assess Storage RequirementsserviceBlueprint
  • Engineer Tank DesignserviceBlueprint
  • Obtain Construction PermitsserviceBlueprint
  • Fabricate Tank ComponentsserviceBlueprint
  • Erect And Weld TankserviceBlueprint
  • Test And Certify IntegrityserviceBlueprint
  • Commission Tank SystemserviceBlueprint
  • Perform Scheduled InspectionsserviceBlueprint

How AGI delivers it

Four ways AGI delivers for Bulk liquid storage tanks construction and maintenance

  • Services-as-Software

    Get the professional outcome delivered as software, priced on results, not headcount.

    Services.do
  • Autonomous Agents as digital employees

    Hire a digital employee that does the job under earned, supervised autonomy.

    Agents.do

Value flow

How Bulk liquid storage tanks construction and maintenance connects

absorbs

  • Storage Asset Maintenancemodel
  • Tank Integrity Managementmodel

composes

  • Asset Inspection Systemmodel
  • Asset Maintenance Systemmodel
  • NDT Inspection Systemmodel
  • Nondestructive Testing Systemmodel
  • Permit Management Systemmodel
  • Structural CAD Softwaremodel
  • Tank Design Softwaremodel

measured by

  • Containment Integritymodel
  • Inspection Compliance Ratemodel
  • Leak Incident Ratemodel
  • Project Schedule Adherencemodel

optimizes

  • Construction Cycle Timemodel
  • Inspection Compliance Ratemodel
  • Tank Availabilitymodel
  • Tank Integritymodel

produces

  • Integrity Inspection Reportmodel
  • Tank Design Drawingsmodel
  • Tank Integrity Inspection Reportmodel
  • Weld Inspection Reportmodel
  • Weld Test Recordsmodel

realizes

  • Assess Storage Requirementsmodel
  • Assess capacity and site needsmodel
  • Commission Tank Systemmodel
  • Commission and certify tankmodel
  • Engineer Tank Designmodel
  • Engineer tank designmodel
  • Erect And Weld Tankmodel
  • Erect and weld tank on-sitemodel
  • Fabricate Tank Componentsmodel
  • Fabricate tank shell platesmodel
  • Obtain Construction Permitsmodel
  • Perform Scheduled Inspectionsmodel
  • Schedule periodic inspection and repairmodel
  • Test And Certify Integritymodel
  • Test welds and hydrostatic integritymodel