Services

What will AGI do for Pipeline flow assurance services?

Flow assurance

The work itself

Grounded Work Profile

Tools

  • Flow Simulation SoftwareserviceBlueprint
  • Chemical Injection SystemserviceBlueprint
  • SCADA SystemserviceBlueprint

Outputs

  • Flow Assurance ModelserviceBlueprint
  • Treatment Program PlanserviceBlueprint
  • Flow Performance ReportserviceBlueprint

Measured by

  • Flow AvailabilityserviceBlueprint
  • Production Deferment RateserviceBlueprint

Key steps

  • Model Multiphase Flow BehaviorserviceBlueprint
  • Identify Flow Risk FactorsserviceBlueprint
  • Design Chemical Treatment ProgramserviceBlueprint
  • Install Monitoring SensorsserviceBlueprint
  • Inject Flow Assurance ChemicalsserviceBlueprint
  • Monitor Flow ConditionsserviceBlueprint
  • Adjust Treatment StrategyserviceBlueprint
  • Report Flow PerformanceserviceBlueprint

How AGI delivers it

Four ways AGI delivers for Pipeline flow assurance services

  • Services-as-Software

    Get the professional outcome delivered as software, priced on results, not headcount.

    Services.do
  • Autonomous Agents as digital employees

    Hire a digital employee that does the job under earned, supervised autonomy.

    Agents.do

Value flow

How Pipeline flow assurance services connects

absorbs

  • Flow Assurance Managementmodel
  • Production Chemistry Managementmodel

composes

  • Chemical Injection Management Systemmodel
  • Chemical Injection Systemmodel
  • Flow Simulation Softwaremodel
  • PVT Analysis Softwaremodel
  • SCADA Systemmodel
  • Thermal-Hydraulic Simulation Softwaremodel

measured by

  • Flow Availabilitymodel
  • Flow Uptimemodel
  • Model Prediction Accuracymodel
  • Production Deferment Ratemodel

optimizes

  • Chemical Dosing Efficiencymodel
  • Flow Availabilitymodel
  • Hydrate Formation Marginmodel
  • Hydrate Formation Riskmodel
  • Pressure Dropmodel
  • Wax Deposition Ratemodel

produces

  • Chemical Dosage Schedulemodel
  • Flow Assurance Modelmodel
  • Flow Assurance Study Reportmodel
  • Flow Performance Reportmodel
  • Thermal-Hydraulic Modelmodel
  • Treatment Program Planmodel

realizes

  • Adjust Treatment Strategymodel
  • Characterize fluid PVT behaviormodel
  • Design Chemical Treatment Programmodel
  • Design chemical inhibition programmodel
  • Gather production and fluid datamodel
  • Identify Flow Risk Factorsmodel
  • Inject Flow Assurance Chemicalsmodel
  • Install Monitoring Sensorsmodel
  • Model Multiphase Flow Behaviormodel
  • Model thermal-hydraulic flow regimesmodel
  • Monitor Flow Conditionsmodel
  • Monitor flow assurance indicatorsmodel
  • Present flow assurance strategymodel
  • Report Flow Performancemodel