Services

What will AGI do for Site development for mining?

The construction and set-up of facilities and infrastructure to develop a mine site from the exploration phase to production.

The work itself

Grounded Work Profile

Tools

  • Mine Planning SoftwareserviceBlueprint
  • Survey EquipmentserviceBlueprint
  • Heavy Earthmoving EquipmentserviceBlueprint

Outputs

  • Site Development PlanserviceBlueprint
  • Earthworks Volume ReportserviceBlueprint

Measured by

  • On-Time Site Readiness RateserviceBlueprint
  • Safety Incident RateserviceBlueprint

Key steps

  • Plan mine site developmentserviceBlueprint
  • Survey and stake site layoutserviceBlueprint
  • Strip overburden and clear groundserviceBlueprint
  • Build haul roads and benchesserviceBlueprint
  • Install drainage and padsserviceBlueprint
  • Hand over site to mine operatorserviceBlueprint

How AGI delivers it

Four ways AGI delivers for Site development for mining

  • Services-as-Software

    Get the professional outcome delivered as software, priced on results, not headcount.

    Services.do
  • Autonomous Agents as digital employees

    Hire a digital employee that does the job under earned, supervised autonomy.

    Agents.do

Value flow

How Site development for mining connects

absorbs

  • Mine Site Preparationmodel
  • Pre-Stripping Processmodel
  • Site Drainage Management Processmodel

composes

  • Accelamodel
  • HCSS HeavyJobmodel
  • Heavy Earthmoving Equipmentmodel
  • Maptek Vulcanmodel
  • Mine Planning Softwaremodel
  • Survey Equipmentmodel
  • Trimble Earthworksmodel

measured by

  • Development Schedule Adherencemodel
  • On-Time Site Readiness Ratemodel
  • Permit Compliance Ratemodel
  • Safety Incident Ratemodel

optimizes

  • Development Cycle Timemodel
  • Earthmoving Throughputmodel
  • Earthwork Cost Per Cubic Yardmodel
  • Equipment Utilization Ratemodel
  • Overburden Removal Ratemodel

produces

  • Drainage Designmodel
  • Earthwork Volume Reportmodel
  • Earthworks Volume Reportmodel
  • Mine Development Planmodel
  • Site Development Planmodel

realizes

  • Build haul roads and benchesmodel
  • Construct pads, ponds, and drainagemodel
  • Hand over site to mine operatormodel
  • Install drainage and padsmodel
  • Plan mine site developmentmodel
  • Receive mine plan and pit layoutmodel
  • Review developed site with operatormodel
  • Strip overburden and build haul roadsmodel
  • Strip overburden and clear groundmodel
  • Survey and permit disturbance areamodel
  • Survey and stake site layoutmodel