Services

What will AGI do for Surface water pollution drainage services?

Positioning for this Coordinate is coming soon.

The work itself

Grounded Work Profile

Tools

  • Geographic Information SystemserviceBlueprint
  • Hydraulic Modeling SoftwareserviceBlueprint
  • Computer Aided Design SoftwareserviceBlueprint
  • SCADA SystemserviceBlueprint
  • Regulatory Compliance SystemserviceBlueprint
  • Reporting PlatformserviceBlueprint

Outputs

  • Drainage Network MapsserviceBlueprint
  • Discharge Compliance RecordsserviceBlueprint

Measured by

  • Discharge Consent Compliance RateserviceBlueprint
  • On Time Delivery RateserviceBlueprint

Key steps

  • Survey site drainage and runoffserviceBlueprint
  • Model stormwater runoff loadsserviceBlueprint
  • Design drainage and interceptor networkserviceBlueprint
  • Install drains and separatorsserviceBlueprint
  • Route runoff to treatmentserviceBlueprint
  • Verify discharge consent limitsserviceBlueprint
  • Issue drainage performance reportserviceBlueprint

How AGI delivers it

Four ways AGI delivers for Surface water pollution drainage services

  • Services-as-Software

    Get the professional outcome delivered as software, priced on results, not headcount.

    Services.do
  • Autonomous Agents as digital employees

    Hire a digital employee that does the job under earned, supervised autonomy.

    Agents.do

Value flow

How Surface water pollution drainage services connects

absorbs

  • Runoff Containment Processmodel
  • Site Runoff Control Processmodel
  • Stormwater Drainage Processmodel
  • Stormwater Management Processmodel

measured by

  • Blockage Response Timemodel
  • Discharge Consent Compliancemodel
  • Discharge Consent Compliance Ratemodel
  • Drainage Network Uptimemodel
  • On-Time Delivery Ratemodel

optimizes

  • Flood Mitigation Levelmodel
  • Flood Resiliencemodel
  • Pollutant Load Reductionmodel
  • Pollutant Removal Efficiencymodel
  • Runoff Capture Ratemodel
  • Runoff Conveyance Capacitymodel

produces

  • Discharge Compliance Recordsmodel
  • Discharge Compliance Reportmodel
  • Discharge Consent Recordmodel
  • Drainage Network Drawingsmodel
  • Drainage Network Mapsmodel
  • Water Quality Sample Logmodel

realizes

  • Design conveyance and interception networkmodel
  • Design drainage and interceptor networkmodel
  • Install drains and separatorsmodel
  • Install drains channels and interceptorsmodel
  • Issue drainage performance reportmodel
  • Model stormwater runoff loadsmodel
  • Obtain discharge consentmodel
  • Report discharge compliancemodel
  • Route runoff through interceptorsmodel
  • Route runoff to treatmentmodel
  • Sample discharge water qualitymodel
  • Survey site drainage and pollutant loadmodel
  • Survey site drainage and runoffmodel
  • Verify discharge consent limitsmodel